MDOT To Install Traffic Sensors On Mid-Michigan Highways

By: Caroline Vandergriff Email
By: Caroline Vandergriff Email

The Michigan Department of Transportation starts the groundwork this week to upgrade its roadside technology.

The Intelligent Transportation System combines the use of traffic cameras, speed sensors, and dynamic message boards to help get traffic moving. The system has already been implemented in Detroit and Grand Rapids. Now MDOT is starting to install the system right here in Mid-Michigan.

"So the concept is to apply the technology to manage traffic during those peak congestion times," said Matt Smith, program manager for MDOT's Intelligent Transportation System.

And to manage traffic in a smarter, more efficient way. The speed sensors can't zero in on individual cars, but they help MDOT gauge overall traffic speed and volume.

"If this segment of traffic is flowing at 70 miles per hour - life is good," said Smith. "Then if all of sudden, our information says hey this traffic is flowing at 30 miles per hour - well that's an indication that something is going wrong."

Then employees at MDOT's traffic center can find out what's going on through the traffic cameras, and communicate with drivers through the dynamic message boards.

"If there's traffic delays or road closures or lane closures, we can post messages whenever that happens," Smith said. "The center is staffed 24 hours a day, 7 days a week,"

Smith says the main goal is to manage traffic, but MDOT also plans to share traffic information with emergency dispatchers to help first responders get to an accident quickly.

The traffic cameras, detectors, and message boards will be installed in nine different locations in the Lansing area. The system will cover I-96 from Williamston Road to US-127, and on US-127 from south of I-96 to south of I-69.

Crews will be in the field this week getting soil samples and doing preliminary work. Then they'll work to install the cameras and sensors through the summer months and into early fall. After getting all the components up by early winter, MDOT hopes to start testing things in the spring.

The entire system will be up and running around this time next year.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:

Read Comments

Comments are posted from viewers like you and do not always reflect the views of this station.
  • by Anonymous Location: Lansing on Jul 11, 2012 at 03:46 AM
    Big Brother is reaching out.
  • by Bruce Location: Dimondale on Jul 10, 2012 at 10:24 AM
    Caroline, I watched your story about the MDOT technology installation this morning with great interest. I have a comment and three questions.  MDOT installed 4 of these signs at the intersection of I-94 and I-69 a year or so ago.  The sign near Turkeyville Road on I-69 southbound in Calhoun county cost $177,093.50 according to Senator Rick Jones office.  There are 4 of these signs surrounding that intersection = $708,374.00 plus the cameras and other monitors.  Questions: We have gotten along without this expensive technology until now.  Why is MDOT spending our road taxes on this stuff now when our roads and bridges are in such bad shape?  What is the total cost of the projects discussed in this piece? How many miles of roads can be repaired with the money MDOT is spending on this technology we haven't yet needed and can't afford?  Have a GREAT day!  Bruce
WILX 500 American Road Lansing, MI 48911 517-393-0110
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 161900575 - wilx.com/a?a=161900575
Gray Television, Inc.